Mechanical Fire Fighting Ductile Cast Iron Reducer
Installation Instruction for Ductile Cast Iron Pipe Concentric Reducer
1. Pipe Preparation
Clean the gasket sealing surface within 16mm of the hole and inspect the sealing surface visually for defects that may prevent proper sealing of the gasket. Don't drill the hole on weld line.
2. Remove burrs
Remove any burrs or slug before installation to protect the gasket and prevent leakage.
3. Gasket&Housing Installation
Insert the gasket into outlet housing and make sure the tab in the gasket line up with the tab recessing in the housing. Align outlet housing over the pipe hole making sure that the locating collar is in the pipe hole.
4. Alignment
Align the strap around the pipe, insert the bolts and tighten the nuts.
5. Tighten nuts
Alternatively and evenly tighten the nuts to the specified bolt torque.
6. Installation complete
There should be even gaps on two sides between the upper and lower housings.
Detailed Images
UL&FM Ductile Iron Grooved Pipe Fitting
Test
In order to guarantee the quality, the company introduced German brand spectrograph, advanced KRX-TG, Metallographic image analyzer, gasket test equipment, green sand test equipment, cast iron assay analysis equipment, pressure inspection equipment etc. Thus afast, accurate quantitative analyzing approach is provided for scale production
Q: Are you trading company or manufacturer?
A: We are a factory.
Q: How long is your delivery time?
A: Generally 15 days after the down payment. OEM 30 to 90 days.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance.
Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
Installation Instruction for Ductile Cast Iron Pipe Concentric Reducer
1. Pipe Preparation
Clean the gasket sealing surface within 16mm of the hole and inspect the sealing surface visually for defects that may prevent proper sealing of the gasket. Don't drill the hole on weld line.
2. Remove burrs
Remove any burrs or slug before installation to protect the gasket and prevent leakage.
3. Gasket&Housing Installation
Insert the gasket into outlet housing and make sure the tab in the gasket line up with the tab recessing in the housing. Align outlet housing over the pipe hole making sure that the locating collar is in the pipe hole.
4. Alignment
Align the strap around the pipe, insert the bolts and tighten the nuts.
5. Tighten nuts
Alternatively and evenly tighten the nuts to the specified bolt torque.
6. Installation complete
There should be even gaps on two sides between the upper and lower housings.
Detailed Images
UL&FM Ductile Iron Grooved Pipe Fitting
Product Name | Ductile Iron grooved Pipe fittings |
Products Series | Rigid Coupling, Flexible Coupling |
Grooved Equal Tee, Grooved Reducing Tee | |
Grooved Mechanical Tee, Threaded Mechanical Tee, Threaded U-Bolted Mechanical Tee | |
90°Elbow,45°Elbow,22.5°Elbow,11.25°Elbow | |
Grooved Equal Cross, Grooved Reducing Cross ,Threaded Reducing Cross | |
Grooved Reducer, Threaded Reducer, Grooved Eccentric Reducer | |
Grooved Adaptor Flange, Threaded Adaptor Flange, | |
Cap | |
Produce per Customer's Drawing | |
Products Range | FM UL approved Ductile Iron grooved Pipe fitting and Couplings Joints |
Certification | FM/UL |
Size | 1/2 inch-16 inch |
Material | Ductile Iron, ASTM A536/QT450-10 |
Technic | Casting |
Working Pressure | 300 PSI/2.07 Mpa |
Surface Finish | Epoxy Powder, Paint, Galvanization, |
Payment Term | T/T,L/C |
Application | 1)Automatic sprinkler system for fire protection on commercial ,civil and municipal constructions like water supplying ,gas supplying, heat supplying, etc |
2)Industrial pipeline system on shipping ,mine, oil field, textile, powder plant, etc. | |
3)Pipeline system on subway station ,railway station ,airport, seaport, bridge, etc |
Company Information
JiXiang Casting Factory has a complete set of casting, machining, coating, rubber, testing and other production and quality testing system. The leading products of the company are grooved pipe fittings and accessories, from the United States, combined with the actual, in strict accordance with the ISO9001 international quality management system to organize production, the products have passed the national fixed fire extinguishing and fire supervision and inspection center, the mechanical component of industrial products testing center and a number of authoritative department testing and certification, all in accordance with the national standard GB5135.Product Process
Test
In order to guarantee the quality, the company introduced German brand spectrograph, advanced KRX-TG, Metallographic image analyzer, gasket test equipment, green sand test equipment, cast iron assay analysis equipment, pressure inspection equipment etc. Thus afast, accurate quantitative analyzing approach is provided for scale production
Our Certificate
Packaging and Shipment
FAQ
Q: Are you trading company or manufacturer?
A: We are a factory.
Q: How long is your delivery time?
A: Generally 15 days after the down payment. OEM 30 to 90 days.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance.
Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.